Environmental and Social Management Plans

EMC prepares Environmental and Social Management Plans as required by the EPA for projects. The ESMPs are prepared in accordance with the EPA’s Guidelines for Preparing ESMPs and is done utilizing the multi-disciplinary team available at EMC. ESMPs prepared by EMC outline measures to address all the potential impacts of the project on the physical, biological and socio-economic environment. The ESMPs usually concentrates on and integrates the environmental, social, biological, health and safety and quality management components of a project. Practical and cost effective measures are identified and outlined to mitigate and manage the potential impacts.

Connect with us

Contact Us

Address:
60 AREA H OGLE 
EAST COAST DEMERARA
GUYANA, SOUTH AMERICA

Tel #: 592-222-4565

Fax #: 592-222-3172

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.